ROOFTOP SOLAR SUBSIDY SCHEME
SOLAR SUBSIDY DBT SCHEME:-
Govt./MNRE (Ministry of New & Renewable Energy) with a motive to simplify the Rooftop Solar Subsidy in Residential Sector launched the DBT (Direct Beneficiary Transfer) Scheme, wherein beneficiary/consumer who want to install solar project at his house can apply at the national portal and get the system installed from the desired vendor and once the system installed as per the parameters and procedures of the scheme. The beneficiary will get the subsidy amount directly in to his account with in 30 days of all the formalities done as per the scheme.
CFA (Central Financial Assistance)/ Subsidy Calculation under DBT Scheme:-
Govt. has fixed the amount of subsidy payable by Govt. on per KW basis, which is Rs. 14588/KWp for projectss up to 3 KW and for projects above 3 KW and up to 10 KW, it will be Rs. 14588/- per kW for first 3 kW and thereafter Rs. 7294/- per kW. For projects above 10 KW, Subsidy is fixed at Rs. 94,822/ KWp.
-
Up to 3 kW :- Rs. 14588/- per kW
-
Above 3 kW and up to 10 kW Rs. 14588/- per kW for first 3 kW and thereafter Rs. 7294/- per kW
-
Above 10 kW Rs. 94822/- fixed
For detailed subsidy calculation, you can download the help document.
Indicative Bill of Materials for standard package of Rooftop Solar Plant under Subsidy Scheme:-
-
Solar PV Panel:- As per MNRE specification/standards and registered in ALMM
-
Grid Connected Inverter:- As per MNRE/BIS Standard regulations
-
Module Mounting Structure (MMS):- Galvanized as per applicable IS
-
Structure Accessories:- Stainless Steel 304
-
Net Meter and Solar meter:- As per DISCOM requirements
-
Array Junction Box:- Protection as per Inverter requirement
-
AC Distribution Board:- Protection as per Inverter & DISCOM/Grid requirement
-
Solar DC Cables:- Total 50 metre in length and as per MNRE Specification
-
AC Cables:- MNRE specifications
-
Earthing:- As per MNRE specifications
-
Lightning Arrestor:- MNRE specifications
-
Earthing Cable / Strip:- MNRE specifications
-
Connectors, Conduit pipes etc:- MNRE specifications
-
Installation Testing & Commissioning:- As per safety norms of SERC/ CEA
-
Performance Testing:- Minimum 75%
-
O&M and Warranty:- 5 Years from the date of commissioning
Why to Choose WATTSCORE:-
-
Empanelled with Govt for Rooftop Solar Subsidy Scheme.
-
Govt.Recognized Start-up (Govt of India as well as Rajasthan) under Start-up India
-
ISO 9001:2005, ISO 14001:2015 and ISO 45001:2018 certified company
-
Tier-1 Solar Equipments
-
Consultive approach
-
Operation and Maintenance support
-
Solar Project Insurance
-
Dedicated customer support
-
Hundreds of Happy Clients